Family-owned and operated · Brisbane, Gold Coast, Logan & IpswichCall our team: 0409 032 954
REQUEST A QUOTE →
☰   Menu
Parallel Wastewater logo, transparent background
Home Sewage Treatment Plants • South East Queensland

Sewage Treatment Plant Installation In Brisbane & the Gold Coast

Complete HSTP installations for new homes, granny flats and septic upgrades. We handle the whole job, from the first site inspection through council approval and installation to effluent irrgation and handover.

Family-owned  ·  Direct owner contact  ·  Taylex and other approved HSTP brands

Green home sewage treatment plant positioned in excavated ground on rural Queensland property
About Parallel Wastewater

HSTP Installations Done Properly

Parallel Wastewater is the specialist wastewater division of Parallel Plumbing & Gas. We install home sewage treatment plants on new homes, acreage properties and granny flats and we upgrade existing septic systems across Brisbane, Logan, Ipswich, Redlands, the Gold Coast and the Scenic Rim. 

A treatment plant is only as good as everything around it. The house drainage needs the right falls, the tank has to sit level on a properly prepared base and the irrigation area has to be laid out to the approved design. If any one of those is off, the plant won’t perform the way it should. That’s why we look at the whole job rather than just dropping a tank in the ground.

We’re family owned, with our own excavator and installation crew. You’ll deal directly with the owner from the first inspection and quote through to installation and handover.

Decommissiong the old septic tank
Excavation prepared and levelled for the HSTP
WHY CHOOSE A TREATMENT PLANT

When a Sewage Treatment Plant Is The Right Choice

A home sewage treatment plant treats wastewater to a much higher standard than a conventional septic tank. Instead of letting solids settle and sending effluent out to trenches, a HSTP aerates and clarifies the wastewater so it leaves the plant clean enough for irrigation.

Cleaner effluent means smaller setbacks and a smaller land application area. That’s what makes a HSTP  the go-to on properties where a septic tank won’t fit or won’t work:

  • Smaller acreage blocks, where there isn’t room for a full septic disposal area
  • Heavy clay soils that won’t absorb effluent from trenches
  • Sloping sites, where trenches are hard to build and keep working
  • Properties near creeks, dams or bores, where setbacks are tight
  • Homes adding a granny flat or extension, where the extra wastewater load is more than the old system can handle

If your block suits a conventional system, see our septic tank installation. The site and soil evaluation will usually make the choice clear and we’ll talk you through it. 

What We Install

Taylex and other Home Sewage Treatment Plant (HSTP) brands

We install a lot of Taylex treatment plants, including the ABS range and we’re happy to install other Queensland-approved brands where they suit the job better. We’re not tied to one supplier. What matters is picking a plant sized to your household, your soil and the approved design, then installing it properly,

Our HSTP work covers:

  • New treatment plants for new home and acreage builds
  • Septic-to-HSTP conversion and replacement of old or failed plants
  • Wastewater upgrades for granny flats and second dwellings
  • Effluent irrigation, both subsurface and surface, laid to the approved design
  • House drainage alterations to suit the new plant location
Taylex home sewage treatment plant installation by Parallel Wastewater
Taylex system — actual installation imagery
Mapping out new drainage
How HSTPS Work

How a Home Sewage Treatment Plant Works

Every brand and model works a little differently, but most plants follow the same basic stages. Here’s how the Taylex ABS 1500, one of the plants we install regularly, treats your wastewater.

Talex ABS1500 Treatment Stages 

  • Primary Treatment: Wastewater from the house enters the first chamber, where solids settle and begin breaking down.
  • Aeration: Air is pumped through the next chamber, feeding bacteria that break down the organic matter
  • Clarification: The water settles again so the remaining fine solids drop out.
  • Final treatment: The clarified water passes through the plants final treatment stage before it’s discharged.
  • Land application: Treated effluent is pumped out to your approved irrigation area.

The power use is small, mostly the air blower and the irrigation pump. When we confirm your system, we’ll go through its capacity, running costs and servicing schedule.

Our advantage

Why Choose Parallel Wastewater?

Supplying a treatment plant is the easy part. What we’re good at is managing the plumbing, drainage, excavation, irrigation and council requirements together, with one point of contact.

  • Hands-on wastewater experience: septic systems, treatment plants, irrigation areas and rural drainage are the work we do every week
  • Own excavator and crew: we keep control of scheduling and workmanship instead of waiting on subcontractors
  • Owner-operated: you deal with the owner, not a chain of contacts
  • Clear, itemised quotes: inclusions, exclusions and allowances are set out before work starts
Our Installation Process

From initial assessment to handover

We’ll explain each stage of the installation so you understand what will happen on your property and what approvals are required before works start.

1. Get in touch

Tell us about your property: a new build, a granny flat or an existing septic that’s giving you trouble

2. Site inspection

We look at the existing drainage, likely plant and irrigation locations, slope and machinery access. Getting a crane truck in for the tank is often the deciding factor.

3. Soil evaluation, design and quote

We coordinate the site and soil evaluation and the wastewater design, then give you a written quote based on the actual system your property needs

4. Council approvals & scheduling

We lodge the plumbing application with your council, then line up the plant delivery, crane, any pump-out and in the installation dates.

5. Installation & irrigation

We excavate and prepare the base, set the plant, connect the house drainage and install the irrigation area to the approved layout. Council inspects a the required stages.

6. Commissioning & handover

The plant is commissioned and tested, then we walk you through how it runs, what not to put down the drain and how servicing works.

Our own excavation equipment
Preparing for a new treatment plant installation
Our Standards

Careful planning, quality workmanship and compliance

Wastewater systems must be installed carefully and in accordance with the approved design, relevant plumbing requirements and council conditions. Particular attention will be given to site levels, pipe gradients, existing underground services, tank placement and the irrigation layout.

We’ll plan excavation and installation works responsibly, coordinate any pump-out or decommissioning requirements and keep you informed throughout the project. Completion will include the final checks, site tidy and any inspection arrangements included in your quotation.

Done properly from the start. It’s the approach we take to both our wastewater installations and larger plumbing projects.

What's Included

A clear scope for your wastewater installation

Every property is different, so we’ll tailor your quotation to the approved design and work involved. Depending on the project, the scope may include:

  • Site evaluation, wastewater design and council application coordination
  • Supply and installation of the approved treatment plant
  • Excavation, tank base preparation and machinery
  • Existing septic or greywater pump-out and decommissioning
  • Required drainage connections and alterations
  • Approved surface or subsurface effluent irrigation
  • Testing, commissioning and applicable inspection arrangements

Your written quotation will identify inclusions, exclusions, allowances and any site-specific risks.

Installing effluent disposal area (Sprinklers)
Treatment plant installation work
Quotations & Cost Factors

Know what's involved before works begin

Installation costs depend on the treatment plant selected, the property’s access, soil and rock conditions, the extent of drainage works, any existing septic system decommissioning and the required irrigation area. Council requirements can also affect the scope.

We’ll set out what’s included and what may be excluded, such as unexpected rock excavation, dewatering, additional risers, spoil removal or landscaping reinstatement unless expressly quoted. Variations will be discussed if conditions or requirements change.

For larger installations, payment stages may include a deposit, agreed progress payments and a final balance due on completion. Your specific terms will be documented in the quotation.

Let's Get Started

Discuss your wastewater installation

Whether you’re building a new home, converting a septic system or adding a granny flat, we’ll discuss your property, the necessary assessment and the next steps.

Request a wastewater installation quote

Tell us a little about your property and what you’re planning. We’ll review your information and discuss the next steps.

0409 032 954  ·  admin@parallelwastewater.com.au